Replacing a Power Supply - Integrated Big Data Platforms

1700 Platform Hardware Replacement Guide for Customers

Product
Integrated Big Data Platforms
Published
March 2018
Language
English (United States)
Last Update
2018-04-17
dita:mapPath
nzd1471887229846.ditamap
dita:ditavalPath
1700.ditaval.ditaval
dita:id
uan1471643170946
Product Category
Hardware
Although this is a hot swap component, Teradata requires that you use the FRU replacement procedure in Server Management Client.

Observe all servicing cautions and warnings.

These illustrations show the replacement of a power supply/cooling module in a drive enclosure that contains array controller modules. The replacement steps for a power supply/cooling module in an enclosure with expansion modules are identical.
To prevent overheating, be prepared to replace the failed power supply/cooling module with the new power supply/cooling module immediately.