Replacing a Power Supply - Integrated Big Data Platforms

1800 Platform Hardware Replacement Guide for Customers

Product
Integrated Big Data Platforms
Published
February 2018
Language
English (United States)
Last Update
2018-04-17
dita:mapPath
ccq1471887350597.ditamap
dita:ditavalPath
1800.ditaval.ditaval
dita:id
bsg1471647535268
Product Category
Hardware
Although this is a hot swap component, Teradata requires that you use the FRU replacement procedure in Server Management Client.

Observe all servicing cautions and warnings.

These illustrations show the replacement of a power supply/cooling module in a drive enclosure that contains array controller modules.
To prevent overheating, be prepared to replace the failed power supply/cooling module with the new power supply/cooling module immediately.