PERIOD(DATE) - Teradata Preprocessor2

Teradata® Preprocessor2 for Embedded SQL Programmer Guide

Product
Teradata Preprocessor2
Release Number
17.00
Published
June 2020
Language
English (United States)
Last Update
2020-06-19
dita:mapPath
whb1544831946911.ditamap
dita:ditavalPath
obe1474387269547.ditaval
dita:id
B035-2446
lifecycle
previous
Product Category
Teradata Tools and Utilities

There are two values for the date: the first value represents the date at the beginning of the period and the second value represents the date following the end of the period.

The host variable is divided in half; each date is placed in the corresponding half using the regular date format processing. This is under control of the -d or DATE() option.