6800H Single Cabinet System, with one 1+1 Clique
One 680 system can be installed in a 6800H cabinet 1+1 clique build, with all-SSD configuration, in U-spaces 32-34. U-space 31 must be left empty when a 680 system is installed above it.
Cabinet_1322
24
6
11
12
13
14
15
16
17
18
19
8
7
5
4
3
2
1
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Attic
Rack U space numbers
1-42 are on the right.
Secondary SM Enet Switch
Primary SM Enet Switch
Drive Enclosure 2 with Controller
Drive Enclosure 1 with Controller
6800 HSN
6800 Node
No chassis allowed
No chassis allowed
Channel / PE / TMS (opt)
Channel / PE / TMS (opt)
Channel / PE / TMS (opt)
Channel / PE / TMS
Channel / PE / TMS
Channel / PE / TMS
System VMS
KVM
36 Port Network 1 Switch
Cabinet VMS
36 Port Network 0 Switch
6800SSD Base 1 + 1 One Clique, Single Cabinet System Power Option ABCD
#
unmanaged chassis
managed chassis
components
loaded/accessible
from rear of cabinet
#
no chassis installed in this space
Server Management chassis ID numbers are on the left.
Drive Enclosure 0 with Controller
Node
second system (field installed only)
6800H Single Cabinet System, with one 2+1 Clique
One 680 system can be installed in a 6800H cabinet 2+1 clique build, with all-SSD configuration, in U-spaces 32-34. U-space 31 must be left empty when a 680 system is installed above it.
6800H 2+1 Single Cabinet System, One Clique per Cabinet, Power A, B, C, or D, with 680
Cabinet_1323
24
6
11
12
13
14
15
16
17
18
19
8
7
1 0
9
5
4
3
2
1
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Attic
Rack U space numbers
1-42 are on the right.
Secondary SM Enet Switch
Primary SM Enet Switch
Drive Enclosure 2 with Controller
Drive Enclosure 1 with Controller
Drive Enclosure 4 with Controller
Drive Enclosure 3 with Controller
6800 HSN
6800 Node
6800 Node
No chassis allowed
Channel / PE / TMS (opt)
Channel / PE / TMS (opt)
Channel / PE / TMS
Channel / PE / TMS
Channel / PE / TMS
System VMS
KVM
36 Port Network 1 Switch
Cabinet VMS
36 Port Network 0 Switch
6800SSD Base 2 + 1 One Clique, Single Cabinet System Power Option ABCD
#
unmanaged chassis
managed chassis
components
loaded/accessible
from rear of cabinet
#
no chassis installed in this space
Server Management chassis ID numbers are on the left.
Drive Enclosure 0 with Controller
Node
second system (field installed only)
6800H Single Cabinet System, with one 3+1 Clique
One 680 system can be installed in a 6800H cabinet 3+1 clique build, with all-SSD configuration, in U-spaces 32-34. U-space 31 must be left empty when a 680 system is installed above it.
6800H 3+1 Single Cabinet System, One Clique per Cabinet, Power A, B, C, or D, with 680
Cabinet_1324
24
6
11
12
13
14
15
16
17
18
19
8
7
1 0
9
5
4
3
2
1
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Attic
Rack U space numbers
1-42 are on the right.
Secondary SM Enet Switch
Primary SM Enet Switch
6800 Node
Drive Enclosure 2 with Controller
Drive Enclosure 1 with Controller
Drive Enclosure 4 with Controller
Drive Enclosure 3 with Controller
6800 HSN
6800 Node
6800 Node
No chassis allowed
Channel / PE / TMS (opt)
Channel / PE / TMS
Channel / PE / TMS
Channel / PE / TMS
System VMS
KVM
36 Port Network 1 Switch
Cabinet VMS
36 Port Network 0 Switch
6800SSD Base 3 + 1 One Clique, Single Cabinet System Power Option ABCD
#
unmanaged chassis
managed chassis
components
loaded/accessible
from rear of cabinet
#
no chassis installed in this space
Server Management chassis ID numbers are on the left.
Drive Enclosure 0 with Controller
Node
second system (field installed only)