Evaluating Environmental Elements Before and After an Installation - Appliance for Hadoop

Appliance for Hadoop 3 and 4 Platforms Product and Site Preparation Guide

Product
Appliance for Hadoop
Published
March 2018
Language
English (United States)
Last Update
2018-04-13
dita:mapPath
alw1471885284809.ditamap
dita:ditavalPath
hadoop3_4.ditaval.ditaval
dita:id
byo1471650857173
Product Category
Hardware
Teradata strongly recommends that air flow measurements be performed before and after equipment installation. As soon as the site for the system installation is confirmed and accessible, perform the initial air flow evaluations. After the equipment installation is completed, repeat the air flow evaluations to verify pre-installation measurements.

Additionally, perform temperature and humidity measurements for each cabinet after the equipment is in production to ensure that the operation of Teradata equipment meets the specifications in Environmental Requirements.