Expansion Cabinet Builds with Nodes for Hadoop and Aster Nodes - Appliance for Hadoop

Appliance for Hadoop 3 and 4 Platforms Product and Site Preparation Guide

Product
Appliance for Hadoop
Published
March 2018
ft:locale
en-US
ft:lastEdition
2018-04-13
dita:mapPath
alw1471885284809.ditamap
dita:ditavalPath
hadoop3_4.ditaval.ditaval
dita:id
byo1471650857173
Product Category
Hardware
30A/32A Phase-Phase or Single-Phase Power with Dell R720, Dell R720xd, or Dell R730 Nodes
Cabinet_0834 Secondary SM Enet Switch Primary SM Enet Switch Expansion Cabinet for 30A/32APhase-Phase or Single-Phase Power Edge Node for Hadoop Data Node for Hadoop Data Node for Hadoop Data Node for Hadoop Data Node for Hadoop Master Node for Hadoop Master Node for Hadoop Cabinet VMS 9 8 7 6 5 4 3 2 1 0 1 1 12 13 15 16 17 18 19 20 21 22 23 24 1 Aster Queen Aster Queen Aster Worker Aster Worker Aster Worker Aster Loader/ Backup # # unmanaged chassis managed chassis components loaded/accessiblefrom rear of cabinet No chassis allowed in thisspace in this cabinet build Maximum cabinet configuration: 11 nodes 2 24-port 1 Gb Ethernet switches for server management (chassis 1 and 24) Minimum Hadoop cluster configuration: 2 Master Nodes for Hadoop, 3 Data Nodes for Hadoop, and 1 Edge Node for Hadoop After the minimum is met, additional Data Nodes and Edge Nodes for Hadoop can be added, with edge nodes above data nodes For configurations using cascaded 36-port switches, the Network-0 and Network-1 switches would be installed in the expansion cabinet at positions 11 and 12 (Network-0 at position 11; Network-1 at position 12) For chassis configuration information on racks containing Aster nodes, see The Teradata Aster Big Analytics Appliance guides If there are Hadoop nodes in the cabinet, a generic TMS, Viewpoint TMS, or SAS HPA Worker node can reside in any chassis ID position except 1, 10, 11, 12, or 25

30A/32A Phase-Phase or Single-Phase Power with One or More Dell R730xd Nodes
Cabinet_1070 Secondary SM Enet Switch Primary SM Enet Switch Expansion Cabinet for 30A/32APhase-Phase or Single-Phase Power Data Node for Hadoop Data Node for Hadoop Data Node for Hadoop Data Node for Hadoop Master Node for Hadoop Master Node for Hadoop Cabinet VMS 9 8 7 6 5 4 3 2 1 0 1 1 12 13 15 16 17 18 19 20 21 22 23 24 1 Aster Queen Aster Queen Aster Worker Aster Worker Aster Worker # # unmanaged chassis managed chassis components loaded/accessiblefrom rear of cabinet No chassis allowed in thisspace in this cabinet build Maximum cabinet configuration: 11 nodes 2 24-port 1 Gb Ethernet switches for server management (chassis 1 and 24) Minimum Hadoop cluster configuration: 2 Master Nodes for Hadoop, 3 Data Nodes for Hadoop, and 1 Edge Node for Hadoop After the minimum is met, additional Data Nodes and Edge Nodes for Hadoop can be added, with edge nodes above data nodes For configurations using cascaded 36-port switches, the Network-0 and Network-1 switches would be installed in the expansion cabinet at positions 11 and 12 (Network-0 at position 11; Network-1 at position 12) For chassis configuration information on racks containing Aster nodes, see The Teradata Aster Big Analytics Appliance guides If there are Hadoop nodes in the cabinet, a generic TMS, Viewpoint TMS, or SAS HPA Worker node can reside in any chassis ID position except 1, 10, 11, 12, or 25 This stackup represents the maximum power configuration for this class of server (ex. Consolidated TMS, High Memory Dell R730xd, E5-2697 CPUs). If your configuration does not include these servers, you may be able to use the restricted slots. Consult with your Terada-ta contact who will work with the Teradata Global Sales Support Specialist for a possible deviation.

60A 3-Phase Delta, 30A 3-Phase Delta, or 30A/32A 3-Phase Wye Power with Dell R720, R720xd, R730, and R730xd Nodes