Vented floor tiles cannot support as much weight as solid tiles. When
moving cabinets in a computer room, replace vented floor tiles with solid floor
tiles along the path where cabinets will be rolled. Failure to do so may cause
damage or collapse of vented floor tiles, resulting in physical damage and/or bodily
injury.
Following are the maximum weights for a cabinet containing factory-installed components. Field-installed components may be heavier.
Unit | Actual Footprint Area (No Stabilizers) | Approx. Installed Weight | Distributed Floor Loading | Concentrated Floor Loading |
---|---|---|---|---|
Appliance for Hadoop 5 cabinet maximum configuration:
|
0.726 sq m (7.8 sq ft) |
820 kg (1807 lb) |
based on cabinet footprint: 1129 kg/sq m (231 lb/sq ft) based on footprint plus servicing clearance required to open doors: 557 kg/sq m (113 lb/sq ft) |
16 kg/sq cm (227 lb/sq in.) |
InfiniBand switch cabinet 108-port maximum configuration:
|
0.73 sq m (7.8 sq ft) |
500 kg (1100 lb) |
based on cabinet footprint: 688 kg/sq m (141 lb/sq ft) based on footprint plus servicing clearance required to open doors: 340 kg/sq m (69 lb/sq ft) |
9.5 kg/sq cm (134 lb/sq in.) |
0.73 sq m (7.8 sq ft) |
420 kg (926 lb) |
based on cabinet footprint: 578 kg/sq m (119 lb/sq ft) based on footprint plus servicing clearance required to open doors: 285 kg/sq m (58 lb/sq ft) |
8.2 kg/sq cm (116 lb/sq in.) |