2850 systems can be included in a Hadoop Appliance 6 cabinet builds with power type A in a 2+0 clique configuration.
4+0 clique configurations require power B, C, or D.
Type A Power: Hadoop Appliance 6 Base Cabinets with 2850 System (2+0 clique)
Type A Power: Hadoop Appliance 6 Base Cabinets with 2850 System (2+0 clique), and optional 10 GbE Switch