The purpose of site environmental control and preparation (that is, for equipment placement, floor layout, airflow delivery requirement, and so on) is to meet the specifications as described in Environmental Requirements.
Ensure that the cooling air at the inlets of individual chassis enclosures within each hardware cabinet meets the environmental requirements outlined in Environmental Requirements.