About Installing the Equipment - Aster Appliances

Aster Appliance 5 Platform Hardware Installation Guide

Product
Aster Appliances
Published
February 2018
Language
English (United States)
Last Update
2018-04-16
dita:mapPath
tax1471886074092.ditamap
dita:ditavalPath
aster5.ditaval.ditaval
dita:id
mlo1471650768316
lifecycle
previous
Product Category
Hardware
The Preinstallation Checklist ensures a complete, systematic, efficient installation of the system hardware. Complete the steps in the order listed, using the specified links and related publications as references.
  1. Review Servicing Cautions and Warnings.
  2. Inspect the shipping container(s) for damage.
  3. Verify the order.
  4. Locate and review the Open Me First document.
  5. Verify the equipment layout.
  6. Refer the customer to the Product and Site Preparation Guide for instructions on uncrating the cabinet .
  7. Refer the customer to the Product and Site Preparation Guide for instructions on acclimating the system and components.
  8. After the system components are properly acclimated, inspect the cabinets and components for damage.
  9. Position and assemble system cabinets.
    If the customer intends to use seismic bracing, refer them to the Product and Site Preparation Guide.
  10. Cable the system.
  11. Power up the system.
  12. Validate the system installation.
  13. Perform the follow-up site evaluation. See the Evaluating Environmental Elements Before and After an Installation topic in the Product and Site Preparation Guide.