Creating a Separate New Workload for Each Selected Row - Teradata Workload Analyzer

Teradata Workload Analyzer User Guide

Product
Teradata Workload Analyzer
Release Number
16.10
Published
May 2017
Language
English (United States)
Last Update
2018-10-13
dita:mapPath
awa1488824663126.ditamap
dita:ditavalPath
Audience_PDF_include.ditaval
dita:id
B035-2514
lifecycle
previous
Product Category
Teradata Tools and Utilities
Teradata WA creates a new workload for each row containing the Criteria #1 and Criteria #2 attributes.
  1. Select Correlation Parameter in the View By box.
  2. Select one or more rows in the Analyze Workloads report with the attributes to be flagged, for example, high CPU usage.
  3. Right-click to display the shortcut menu.
  4. Select Auto-Generate Workloads. The Auto-Generate Workloads dialog box appears.


  5. Select an option as described in the table below.
    Enforcement Priority Option Description
    Tactical Short queries with a fixed response-time requirement.
    Priority Important queries that should get extra resources.
    Normal Normal queries (the default).
    Background Low-priority queries with no response time requirement.
  6. Click OK.