Creating a New Workload from a Particular Bucket in the Histogram - Teradata Workload Analyzer

Teradata Workload Analyzer User Guide

Product
Teradata Workload Analyzer
Release Number
16.10
Published
May 2017
Language
English (United States)
Last Update
2018-10-13
dita:mapPath
awa1488824663126.ditamap
dita:ditavalPath
Audience_PDF_include.ditaval
dita:id
B035-2514
lifecycle
previous
Product Category
Teradata Tools and Utilities
For this procedure, Estimated Processing Time is used as an example.
  1. From the Estimated Processing Time histogram, highlight the bucket to be analyzed, then right-click.

    The shortcut menu appears. See Adding Existing Classifications to New Workloads.



  2. Select the Split to New Workload option.

    The Estimated Processing Time dialog box appears.



  3. Enter the minimum and maximum processing time bucket parameters.
  4. Click OK.

    The Add Workload dialog box appears.



  5. Enter the workload attribute details. See the table after step 4 of Grouping Unassigned Requests into a New Workload for more information.
  6. Click OK.

    A new workload is created with Minimum and Maximum Estimated Processing Time along with the first level of classifications. The selected row/bucket is removed from the Analyze Workload report.