Flow Control - Teradata Workload Management - Database Engine 20

Workload Management User Guide - 20.00

Deployment
VantageCloud
VantageCore
Edition
VMware
Enterprise
IntelliFlex
Product
Database Engine 20
Teradata Workload Management
Release Number
20.00
Published
June 2025
ft:locale
en-US
ft:lastEdition
2025-11-20
dita:mapPath
gew1747088853217.ditamap
dita:ditavalPath
jlp1749501702948.ditaval
dita:id
icm1467243640567
Product Category
Teradata Vantage

Flow control means that some tasks cannot send more work to busy AMPs. If many AMPs are in flow control, response times degrade and become inconsistent. This is a more serious situation than simple AWT depletions because request priorities are not honored while messages are being retried.

To define a system Flow Control event, specify the number of AMPs that report flow control during the Qualification period. TASM does not distinguish between being in flow control for 1 msec and being in flow control for the entire interval. Different AMPs can be in flow control during the Qualification period, as long as the # of AMPs criterion is met.