Site Wiring for System Integrity | Teradata Vantage - Site Wiring for System Integrity - IntelliFlex Platforms - Teradata Vantage

Preparing Your Site For Teradata Vantageā„¢ Hardware - 2.5

Deployment
VantageCore
Edition
IntelliFlex
Product
IntelliFlex Platforms
Teradata Vantage
Release Number
2.5
Published
March 2024
ft:locale
en-US
ft:lastEdition
2024-04-26
dita:mapPath
ske1710762973120.ditamap
dita:ditavalPath
oqt1542232706976.ditaval
dita:id
gpk1556809249221
Product Category
Hardware
Teradata Vantage
For maximum system integrity, observe the following:
  • All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.
  • All system components should be on dedicated branch circuits from a distribution panel that does not supply any switched inductive loads (motors, air conditioners, and so on).
  • Nothing else should be connected to the branch circuits except other computer equipment.
  • The socket outlet shall be installed near the equipment and shall be accessible.