Site Wiring for System Integrity - Data Warehouse Appliances

2750 Platform Product and Site Preparation Guide

Product
Data Warehouse Appliances
Published
March 2018
Language
English (United States)
Last Update
2018-04-17
dita:mapPath
epb1471886869774.ditamap
dita:ditavalPath
2750.ditaval.ditaval
dita:id
flv1471648428019
Product Category
Hardware
For maximum system integrity, observe the following:
  • All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.
  • All system components should be on dedicated branch circuits from a distribution panel that does not supply any switched inductive loads (motors, air conditioners, and so on).
  • Nothing else should be connected to the branch circuits except other computer equipment.
  • The socket-outlet shall be installed near the equipment and shall be accessible.