Estimated Power | IntelliFlex 2.x Cabinets - Estimated Power: IntelliFlex 2.x Cabinets - IntelliFlex Platforms - Teradata Vantage

Preparing Your Site For Teradata Vantageā„¢ Hardware

Product
IntelliFlex Platforms
Teradata Vantage
Release Number
1.3
Published
December 2020
Language
English (United States)
Last Update
2022-08-16
dita:mapPath
xri1558462322389.ditamap
dita:ditavalPath
oqt1542232706976.ditaval
dita:id
B035-6210
lifecycle
previous
Product Category
Hardware
Teradata Vantage
Maximum Configuration Estimated power is not expected to exceed 14.7 kW when AC is provided to all power cords with:
  • Sixteen nodes (combination of SQL Engine nodes, hot standby nodes (HSNs), and PE nodes with 768 GB memory)
  • Eight solid state storage arrays (SSDs) using DE224C drive enclosures, and 2806 or 5700 controllers
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
High CPU Configuration

(IntelliFlex

2.1.1 only)

Estimated power is not expected to exceed 13.0 kW when AC is provided to all power cords with:
  • Fourteen nodes. Combination of 2x6 nodes, 2 hot standby nodes (HSNs)
  • Two solid state storage arrays (SSDs). Each array has a storage controller tray (SSDs) and a dependent tray (SSDs), using DE224C drive enclosures
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management Switches
  • Two VMSs
  • KMM
Balanced Configuration

(IntelliFlex

2.1.1 only)

Estimated power is not expected to exceed 15.1 kW when AC is provided to all power cords with:
  • Nine or thirteen nodes. Combination of SQL Engine nodes plus 1 hot standby node (HSN)
  • Two or three solid state storage arrays. Each array has a storage tray (SSDs) and a dependent tray (SSDs), using DE224C drive enclosures
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management Switches
  • Two VMSs
  • KMM
Hybrid SSD Configuration

(10-node Clique)

Estimated power is not expected to exceed 12.1 kW when AC is provided to all power cords with:
  • A 10-node clique (10 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Five SSDs using 5350 drive enclosures and 5600 controllers, or DE224C drive enclosures and 5700 controllers (WI arrays)
  • Five SSDs using DE224C drive enclosures and 2806 controllers (RI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
Hybrid SSD Configuration

(12-node Clique)

Estimated power is not expected to exceed 12.6 kW when AC is provided to all power cords with:
  • A 12-node clique (12 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Four SSDs using 5350 drive enclosures and 5600 controllers, or DE224C drive enclosures and 5700 controllers (WI arrays)
  • Four SSDs using DE224C drive enclosures and 2806 controllers (RI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
RI-only Configuration

(10-node Clique)

Estimated power is not expected to exceed 10.2 kW when AC is provided to all power cords with:
  • A 10-node clique (10 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Five SSDs using DE224C drive enclosures and 2806 controllers (RI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
RI-only Configuration

(14-node Clique)

Estimated power is not expected to exceed 13.6 kW when AC is provided to all power cords with:
  • A 14-node clique (14 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Seven SSDs using DE224C drive enclosures and 2806 controllers (RI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
WI-only Configuration

(Five SSDs)

Estimated power is not expected to exceed 10.0 kW when AC is provided to all power cords with:
  • A 10-node clique (10 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Five SSDs using 5350 drive enclosures and 5600 controllers, or DE224C drive enclosures and 5700 controllers (WI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM
WI-only Configuration

(Ten SSDs)

Estimated power is not expected to exceed 11.9 kW when AC is provided to all power cords with:
  • A 10-node clique (10 Advanced SQL Engine nodes with 768 GB memory)
  • One HSN
  • Ten SSDs using 5350 drive enclosures and 5600 controllers, or DE224C drive enclosures and 5700 controllers (WI arrays)
  • Mellanox SB7800 BYNET and Dell X1052 or Dell N1148T-ON Server Management switches
  • Two VMSs
  • KMM