Installing the Bottom Front Cabinet Air Baffle | Teradata Vantage - Installing the Bottom Front Cabinet Air Baffle - IntelliFlex Platforms - Teradata Vantage

Preparing Your Site For Teradata Vantageā„¢ Hardware

Product
IntelliFlex Platforms
Teradata Vantage
Release Number
1.3
Published
December 2020
Language
English (United States)
Last Update
2022-08-16
dita:mapPath
xri1558462322389.ditamap
dita:ditavalPath
oqt1542232706976.ditaval
dita:id
B035-6210
lifecycle
previous
Product Category
Hardware
Teradata Vantage
  1. If an air baffle kit was ordered, slide the metal part of the baffle under the front lip of the cabinet cross member at the front of the cabinet.
  2. Align the swage nuts in the baffle to the oval holes in the front lip of the cabinet cross member.
  3. Thread the two screws into the pem nuts and tighten.

    Installing the bottom front cabinet air baffle