Bulk Load Features | Teradata Business Continuity Manager - Bulk Load Features - Teradata Business Continuity Manager

Teradata® Business Continuity Manager User Guide

Product
Teradata Business Continuity Manager
Release Number
1.0
Published
January 2022
Language
English (United States)
Last Update
2022-01-27
dita:mapPath
otc1639627713801.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-2550
lifecycle
previous
Product Category
Analytical Ecosystem

Running Bulk Loads allows Business Continuity Manager to:

  • Load the bulk load data on both systems simultaneously.
  • Commit the data at the load checkpoint only after the session is successful on the active system.

    If the load checkpoint fails on the active system, Business Continuity Manager rolls back the load checkpoint on the standby system. This process makes sure that there is no significant gap between the active and standby system load job progress.

  • Store the bulk load data in the /data directory.