System Load Configurations - BAR Managed Servers - IntelliBase Platforms - IntelliFlex Platforms

Teradata® Hardware Site Preparation Guide

Product
BAR Managed Servers
IntelliBase Platforms
IntelliFlex Platforms
Published
October 2020
Language
English (United States)
Last Update
2020-10-26
dita:mapPath
fsf1526587780889.ditamap
dita:ditavalPath
exclude_all_interim_filters_FLUTO.ditaval.ditaval
dita:id
fsf1526587780889
Product Category
Hardware

Teradata power subsystems use load sharing by default. Sites can expect an approximate increase of 100% in load on the active line when the other source of power fails. A source has 50% of the load to start with, and when AC is lost from the other source, the remaining 50% of the load transfers to the active source.

Products with four cords need special attention when plugging in at sites with redundant power to make sure of proper operation if one power source fails.
  • If the cabinet uses four cords and has orange and blue AC boxes, the two orange cords go to one site source, and the two blue cords go to the second site source.
  • If the cabinet uses four cords and has four AC feeder boxes, the cords from the two left-side AC feeder boxes go to one site source, and the cords from the two right-side AC feeder boxes go to the second site source.