Teradata PT Cataloged Procedure (PT#TPT) - Parallel Transporter

Teradata Parallel Transporter User Guide

Product
Parallel Transporter
Release Number
16.10
Published
May 2017
Language
English (United States)
Last Update
2018-05-09
dita:mapPath
vyv1488824663502.ditamap
dita:ditavalPath
Audience_PDF_product_tpt_userguide_include.ditaval
dita:id
B035-2445
lifecycle
previous
Product Category
Teradata Tools and Utilities

A sample Teradata PT cataloged procedure has been included. There are 2 jobsteps.

  • The first jobstep, ALLOC, allocates the checkpoint datasets if necessary.

    If they exist, the Teradata PT job uses the contained information in restart mode. ALLOC always deletes the log dataset, if it exists, and allocates a new log for the current job.

  • The second jobstep, TPT, executes Teradata PT.

    Use symbolic parameters to specify the script and job attribute files, enter any Teradata PT parameters, and create a unique high-level qualifier for the checkpoint and log datasets.

    See PT$TPTAL for an example of how symbolic parameters are set.