System Load Configurations - BAR Managed Servers

Teradata Platform Framework Cabinet Model 12 Product and Site Preparation Guide

Product
BAR Managed Servers
Published
February 2018
Language
English (United States)
Last Update
2018-04-18
dita:mapPath
lur1471887722020.ditamap
dita:ditavalPath
9212.ditaval.ditaval
dita:id
tlu1471650703436
Product Category
Hardware
All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.

Teradata power subsystems use load sharing by default. Sites can expect an approximate increase of 100% in load on the active line when the other source of power fails. That is, a source has 50% of the load to start with, and when AC is lost from the other source, the remaining 50% of the load transfers to the active source.

Products with four cords need special attention when plugging in at sites with redundant power to ensure proper operation if one power source fails.
  • If the cabinet uses four cords and has orange and blue AC boxes, the two orange cords go to one site source, and the two blue cords go to the second site source.