16.20 - About Moving a Test System into Production - Teradata Tools and Utilities

Teradata® Tools and Utilities for IBM z/OS Installation Guide

Product
Teradata Tools and Utilities
Release Number
16.20
Published
October 2018
Language
English (United States)
Last Update
2019-03-07
dita:mapPath
ovw1527114222335.ditamap
dita:ditavalPath
ovw1527114222335.ditaval

Use one of the following methods to move a test system to production:

  • Rename the data sets
  • Switch the data sets
  • Copy the data sets