Creating a New Workload from a Particular Bucket in the Histogram - Teradata Workload Analyzer

Teradata Workload Analyzer User Guide

Product
Teradata Workload Analyzer
Release Number
17.00
Published
September 2019
Language
English (United States)
Restricted Access
TTU-17.00-EAP
Last Update
2019-06-07
dita:mapPath
vjd1544831946946.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-2514
Product Category
Teradata Tools and Utilities
For this procedure, Estimated Processing Time is used as an example.
  1. From the Estimated Processing Time histogram, highlight the bucket to be analyzed, then right-click.

    The shortcut menu appears. See Adding Existing Classifications to New Workloads.

  2. Select the Split to New Workload option. The Estimated Processing Time dialog box appears.
  3. Enter the minimum and maximum processing time bucket parameters.
  4. Click OK. The Add Workload dialog box appears.
  5. Enter the workload attribute details. See the table after step 4 of Grouping Unassigned Requests into a New Workload for more information.
  6. Click OK. A new workload is created with Minimum and Maximum Estimated Processing Time along with the first level of classifications. The selected row/bucket is removed from the Analyze Workload report.