Creating a New Workload for Use - Teradata Workload Analyzer

Teradata Workload Analyzer User Guide

Product
Teradata Workload Analyzer
Release Number
17.00
Published
September 2019
Language
English (United States)
Restricted Access
TTU-17.00-EAP
Last Update
2019-06-07
dita:mapPath
vjd1544831946946.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-2514
Product Category
Teradata Tools and Utilities
  1. Select Rule Set > Save to Database. The Save Rule Set dialog box appears.
  2. Enter a name for the rule set or accept the default name.
  3. Click OK to save the new workload for use.
    The TDWM database is locked as a rule set is saved.