After a workload is analyzed, you can view and modify details about the workload, such as workload period and service level goals.
Avoid modifying workload classifications using the following procedure with New Workload Recommendations or Existing Workload Analysis as changes made on the tabbed dialogs will not be reflected in the Workloads Report.