Example: Generating a Statement of Estimated Space per AMP in a Four-AMP System - Advanced SQL Engine - Teradata Database

SystemFE Macros

Product
Advanced SQL Engine
Teradata Database
Release Number
17.05
17.00
Published
June 2020
Language
English (United States)
Last Update
2021-01-23
dita:mapPath
ynt1557098768177.ditamap
dita:ditavalPath
lze1555437562152.ditaval
dita:id
B035-1103
lifecycle
previous
Product Category
Teradata Vantageā„¢

The following statement generates a report which provides the estimated space required per AMP to reconfigure a four-AMP system:

Exec ReconfigCheck (4);

The resulting report follows:

*** Delete completed. One row removed.
*** Total elapsed time was 1 second.
*** Insert completed. One row added.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Echo accepted.
 *** Query completed. One row found. 2 columns returned.
13/05/21                  Bytes Required For 4 AMP System                  10:50
                                          Bytes
                                       Required
                                        Per AMP
                                 --------------
                                  1,021,118,464
 *** Echo accepted.