Site Wiring for System Integrity | Teradata Vantage - Site Wiring for System Integrity - IntelliFlex Platforms - Teradata Vantage

Preparing Your Site For Teradata Vantageā„¢ Hardware

Product
IntelliFlex Platforms
Teradata Vantage
Release Number
1.0
Published
May 2019
Language
English (United States)
Last Update
2022-09-22
dita:mapPath
iin1558129751076.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-6210
lifecycle
previous
Product Category
Hardware
Teradata Vantage
For maximum system integrity, observe the following:
  • All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.
  • All system components should be on dedicated branch circuits from a distribution panel that does not supply any switched inductive loads (motors, air conditioners, and so on).
  • Nothing else should be connected to the branch circuits except other computer equipment.
  • The socket outlet shall be installed near the equipment and shall be accessible.