Site Load Configurations | Teradata Vantage - System Load Configurations - IntelliFlex Platforms - Teradata Vantage

Preparing Your Site For Teradata Vantageā„¢ Hardware

Product
IntelliFlex Platforms
Teradata Vantage
Release Number
1.0
Published
May 2019
Language
English (United States)
Last Update
2022-09-22
dita:mapPath
iin1558129751076.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-6210
lifecycle
previous
Product Category
Hardware
Teradata Vantage

Teradata power subsystems use load sharing by default. Sites can expect an approximate increase of 100% in load on the active line when the other source of power fails. A source has 50% of the load to start with, and when AC is lost from the other source, the remaining 50% of the load transfers to the active source.

Products with four cords need special attention when plugging in at sites with redundant power to make sure of proper operation if one power source fails.
  • If the cabinet uses four cords and has orange and blue AC boxes, the two orange cords go to one site source, and the two blue cords go to the second site source.
  • If the cabinet uses four cords and has four AC feeder boxes, the cords from the two left-side AC feeder boxes go to one site source, and the cords from the two right-side AC feeder boxes go to the second site source.