There are three Aster connectors that can be used in Informatica. They are ncluster_loader, ncluster_export, and Aster Relational connection. In this scenario, only ncluster_loader and ncluster_export can be used.
Make the following settings in the Informatica PowerCenter Workflow Manager:
- Click the connection in the top menu bar and select Application in the drop down list to configure ncluster_export.
- Select Loader to configure the ncluster_loader.
-
Click New to set the new connection or Edit to configure the existing ones as listed below.
Scenario 1: Informatica Connector Client-Side Settings ncluster_export Attribute Value Aster nCluster Executable Name ncluster_export Aster nCluster Host Name your Queen IP address Aster nCluster Port Number usually 2406 Aster nCluster Database Name your database name Timeout default is 30 Enable SSL check box SSL Encrypt Reads do not check box SSL Self Signed Peer check box SSL Private Key Path SSL Certificate Path SSL Trusted CA Dir SSL Trusted CA Filename SSL Certificate File Type default is 1 Scenario 1: Informatica Connector Client-Side Settings ncluster_loader Attribute Value Aster nCluster Executable Name ncluster_loader Aster nCluster Host Name your Queen IP address Aster nCluster Port Number usually 2406 Aster nCluster Database Name your database name Timeout default is 30 Enable SSL check box SSL Encrypt Reads do not check box SSL Self Signed Peer check box SSL Private Key Path SSL Certificate Path SSL Trusted CA Dir SSL Trusted CA Filename SSL Certificate File Type default is 1