In-Doubt Resolution - IBM IMS/DC Interface for Teradata

IBM IMS/DC Interface for Teradata Reference

Product
IBM IMS/DC Interface for Teradata
Release Number
16.10
Published
May 2017
Language
English (United States)
Last Update
2018-05-03
dita:mapPath
jah1488824663543.ditamap
dita:ditavalPath
Audience_PDF_include.ditaval
dita:id
B035-2447
lifecycle
previous
Product Category
Teradata Tools and Utilities

It is possible for a failure to occur during the 2PC session during one of the following circumstances:

  • The communication link between the coordinator, such as IMS, and the participant, such as a Teradata DBS, is lost.
  • There is an IMS system crash.
  • A participant, such as DB2, experiences a system failure.

When the electrical power, system, or communication line is restored after a failure, the coordinator reconciles existing activity logs from the coordinator and the participants.

If the logs cannot be reconciled, then in-doubt resolution is necessary.

There are two forms of in-doubt resolution: automatic and manual.