Seismic Bracing for a Teradata Cabinet - Data Warehouse Appliances

2700 Platform Product and Site Preparation Guide

Product
Data Warehouse Appliances
Published
March 2018
Language
English (United States)
Last Update
2018-04-18
dita:mapPath
yop1471886638949.ditamap
dita:ditavalPath
2700.ditaval.ditaval
dita:id
zqx1471648424914
Product Category
Hardware

Teradata recommends using a qualified seismic bracing installation company to secure the Teradata cabinets to the floor.

The shipping brackets that held the cabinet to the shipping pallet may be used to attach the cabinet to the floor. Use the following figure as a guide in locating tie-down points for attaching the shipping brackets.

Seismic Bracing Tie-Down Points

Before attaching multiple cabinets to the floor, join the cabinets together using the cabinet docking hardware. See the Hardware Installation Guide.