Procedure - MultiLoad

Teradata MultiLoad Reference

Product
MultiLoad
Release Number
15.00
Language
English (United States)
Last Update
2018-09-27
dita:id
B035-2409
lifecycle
previous
Product Category
Teradata Tools and Utilities

Procedure

Estimating the amount of permanent space that a Teradata MultiLoad job requires is a three-step procedure:

1 Prepare a preliminary estimate for the work table and error table requirements, using a set of simplifying assumptions:

  • There is only one target table.
  • It has no fallback protection, no journals, and no NUSIs.
  • The job does not write to the error tables.
  • Teradata Database does not experience a restart condition while the job is running.
  • 2 Adjust the preliminary estimate according to the actual job requirements and expectations:

  • Fallback protection
  • Journals
  • Non-unique indexes
  • Multiple target tables
  • Error table entries
  • Teradata Database restarts
  • 3 Compute and add the space requirements for the restart log table.

    The following topics describe each step of the estimation procedure.