Checkpointing and Restarting - Parallel Transporter

Teradata Parallel Transporter Reference

Product
Parallel Transporter
Release Number
16.10
Published
July 2017
Language
English (United States)
Last Update
2018-06-28
dita:mapPath
egk1499705348414.ditamap
dita:ditavalPath
Audience_PDF_include.ditaval
dita:id
B035-2436
lifecycle
previous
Product Category
Teradata Tools and Utilities

The Export operator takes a checkpoint only when all data is sent to the data stream. If a restart occurs, the operator either must send all of the data or none of the data depending on whether the checkpoint has taken place.

  • If all the data is sent, then the operator displays the following message and does not resend any of the data:
    Restart indicates that this export job completed.
  • If all the data is not sent, the operator terminates. Restart the job from the beginning.
  • If none of the data is sent, the operator sends the data.

The Export operator does not support a user-defined restart log table.

If a checkpoint interval is specified on the tbuild command line, the checkpoints incurred between the start of data loading and the end of data loading are ignored by the Export operator.