Repacking for Shipment - Data Mart Appliances

670 Platform Product and Site Preparation Guide

Product
Data Mart Appliances
Published
June 2015
Language
English (United States)
Last Update
2018-04-13
dita:mapPath
rac1471886432192.ditamap
dita:ditavalPath
670.ditaval.ditaval
dita:id
oiu1471648935842
Product Category
Hardware

The customer is responsible for repacking the equipment when repacking is necessary.

  1. Refer to the figures in Uncrating a Cabinet, if needed, during this procedure.
  2. Orient the container so the front side (the side where the panel labeled RAMP will be attached) is facing the cabinet. This requires at least 3.7 m (12 ft) of clearance area in front of the container. The width required in front is 1.8 m (6 ft).
  3. Attach the ramp to the front of the pallet using the rectangular metal brackets. There are 3/8-inch Tee nuts in both the pallet and the ramp. Make sure the ramp is securely fastened to the pallet.
  4. Make sure adequate help is available to support the unit at the front and the rear.
    A fully configured cabinet is very heavy.
  5. Position the cabinet so that its front goes up the ramp first.
  6. Position one person at the front of the cabinet to help guide the unit while two other people at the rear slowly roll it up the ramp and onto the container.
  7. Bolt the shipping brackets on the front and rear of the cabinet and pallet.
  8. Replace the plastic bag, and protective foam collars from top and middle.
  9. Attach the side and rear panels of the shipping container with spring clips.
  10. Attach the other side panel with spring clips.
  11. Unbolt the ramp and carefully raise it to vertical and secure with spring clips.
  12. Install the top of the container, to secure the ramp in the vertical position.
  13. Install new banding on the outside of the container.