Configuring Retention Periods - Teradata Viewpoint

Teradata Viewpoint User Guide

Product
Teradata Viewpoint
Release Number
16.10
Published
June 2017
Language
English (United States)
Last Update
2018-03-29
dita:mapPath
hkd1478709580913.ditamap
dita:ditavalPath
2206_User_vp_1610.ditaval.ditaval
dita:id
B035-2206
lifecycle
previous
Product Category
Analytical Ecosystem
You can change the retention period for any job or table within a job by using the Retention Periods tab in the Edit Jobs view.
  1. Click in the box of the job type and applicable table that you want to configure.
  2. Type the number of days you want for the retention period. Numbers 1 through 9999 are valid.
  3. [Optional] Click Restore Defaults to return the values to their original states.
  4. Click Save.