Site Power Cabling in an Aster Big Analytics Appliance Cabinet - Aster Appliances

Aster Appliance 5 Platform Hardware Installation Guide

Product
Aster Appliances
Published
February 2018
Language
English (United States)
Last Update
2018-04-16
dita:mapPath
tax1471886074092.ditamap
dita:ditavalPath
aster5.ditaval.ditaval
dita:id
mlo1471650768316
lifecycle
previous
Product Category
Hardware

Site Power Cabling for 2-Cord Cabinet

Customer source power may originate from various sources, such as, circuit breaker panels, UPSs, separate utility power sources, or power distribution units. The Power cord(s) of the leg A AC feeder box(es) must be connected to one power source, and the power cord(s) of the leg B AC feeder box(es) must be connected to a separate power source. Any disturbance to one source due to maintenance or component failure must not impact the second source.

Connect cabinets with two cords as shown.

Site Power Cabling for 2-Cord Cabinet - Bottom Egress

Site Power Cabling for 2-Cord Cabinet - Top Egress

Site Power Cabling for 4-Cord Cabinet

Connect cabinets with four cords as shown.

Site Power Cabling for 4-Cord Cabinet - Bottom Egress

Site Power Cabling for 4-Cord Cabinet - Top Egress