The Preinstallation Checklist ensures a complete, systematic, efficient installation of the system hardware. Complete the steps in the order listed, using the specified links and related publications as references.
- Review Servicing Cautions and Warnings.
- Inspect the shipping container(s) for damage.
- Verify the order.
- Locate and review the Open Me First document.
- Verify the equipment layout.
- Refer the customer to the Product and Site Preparation Guide for instructions on uncrating the cabinet .
- Refer the customer to the Product and Site Preparation Guide for instructions on acclimating the system and components.
- After the system components are properly acclimated, inspect the cabinets and components for damage.
-
Position and assemble system cabinets.
If the customer intends to use seismic bracing, refer them to the Product and Site Preparation Guide.
- Cable the system.
- Power up the system.
- Validate the system installation.
- Perform the follow-up site evaluation. See the Evaluating Environmental Elements Before and After an Installation topic in the Product and Site Preparation Guide.