UTY1625 Incompatible use of the FROM/FOR/THRU option with a previously specified CHECKPOINT parameter, terminating. - FastExport - MultiLoad - Parallel Data Pump

FastExport, MultiLoad, and TPump (UTY Prefix) Messages

Deployment
VantageCloud
VantageCore
Edition
Enterprise
IntelliFlex
Lake
VMware
Product
FastExport
MultiLoad
Parallel Data Pump
Release Number
15.xx, 16.xx, 17.xx, 20.xx
Published
June 2021
Language
English (United States)
Last Update
2023-11-20
lifecycle
Latest
Product Category
Teradata® Tools and Utilities

UTY1625 Incompatible use of the FROM/FOR/THRU option with a previously specified CHECKPOINT parameter, terminating.

Explanation:

When using a FastLoad-compatible inmod, it is invalid to specify the FROM/FOR/THRU option if a CHECKPOINT parameter has been previously specified.

Generated By:

MLDSTMT

Remedy:

The FROM/FOR/THRU option on the IMPORT statement is incompatible with the CHECKPOINT parameter of the BEGIN MLOAD statement. Specify one or the other depending on the requirements of the application.