Seismic Bracing for a Teradata Cabinet - BAR Managed Servers - IntelliBase Platforms - IntelliFlex Platforms

Teradata® Hardware Site Preparation Guide

Product
BAR Managed Servers
IntelliBase Platforms
IntelliFlex Platforms
Published
October 2020
Language
English (United States)
Last Update
2020-10-26
dita:mapPath
fsf1526587780889.ditamap
dita:ditavalPath
exclude_all_interim_filters_FLUTO.ditaval.ditaval
dita:id
fsf1526587780889
Product Category
Hardware

Use a qualified seismic bracing installation company to secure the cabinets to the floor.

Use the shipping brackets that held the cabinet to the shipping pallet to attach the cabinet to the floor.

Seismic Bracing Tie-Down Points
Seismic bracing tie-down points

Before attaching multiple cabinets to the floor, join the cabinets using the cabinet docking hardware.