Restarting a Checkpoint Operation - TARA/ABU

Teradata Archive/Recovery Utility Reference

Product
TARA/ABU
Release Number
15.10
Language
English (United States)
Last Update
2018-10-07
dita:id
B035-2412
lifecycle
previous
Product Category
Teradata Tools and Utilities

When CHECKPOINT writes rows to a journal, the transient journal also keeps a record of these rows. Consequently, if the client or Teradata ARC fails, the results of the checkpoint operation are rolled back by the transient journal.

  • If a Teradata ARC statement specified checkpoints on multiple journal tables, Teradata ARC rolls back only the checkpoint being taken at the time of the client or utility failure.
  • If CHECKPOINT terminates abnormally, all locks placed by Teradata ARC are removed.
  • When Teradata ARC restarts, the CHECKPOINT statement completes.