For maximum system integrity, observe the following:
  • All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.
  • All system components should be on dedicated branch circuits from a distribution panel that does not supply any switched inductive loads (motors, air conditioners, and so on).
  • Nothing else should be connected to the branch circuits except other computer equipment.
  • The socket outlet shall be installed near the equipment and shall be accessible.