About Moving a Test System into Production - Teradata Tools and Utilities

Teradata Tools and Utilities for IBM z/OS Installation Guide

Product
Teradata Tools and Utilities
Release Number
15.00
Published
March 2014
Language
English (United States)
Last Update
2018-09-28
dita:mapPath
PDF_Installation_ZOS_15_00.ditamap/B035-3128-035K.ditamap
dita:ditavalPath
ft:empty
dita:id
B035-3128
lifecycle
previous
Product Category
Teradata Tools and Utilities

Use one of the following methods to move a test system to production:

  • Rename the data sets
  • Switch the data sets
  • Copy the data sets