Enabling Drill-Through - Teradata Schema Workbench

Teradata Schema Workbench User Guide

Product
Teradata Schema Workbench
Release Number
16.20
16.10
15.10
Published
June 2015
Language
English (United States)
Last Update
2018-05-25
dita:mapPath
gvf1512702977003.ditamap
dita:ditavalPath
Audience_PDF_include.ditaval
dita:id
B035-4106
Product Category
Teradata Tools and Utilities
  1. Expand the schema on the Schema Tree View.
  2. Expand the Measure Groups folder on the Schema Tree View in the left pane.
  3. Select the measure group that is to be enabled for drill-through.
  4. The panel for Measure Groups will open in the Schema Element Properties View in the right pane. Select the Drill Through tab.
  5. Select the Enabled box to enable Drill-Through.
  6. The list of columns to be returned to the BI client is listed. If the list is empty, click the Reset to Default button. The default result set of a drill-through operation will include one column for each measure in the measure group, as well as one column for the lowest level of the default hierarchy of each dimension associated with the measure group.

    At this point, drill-through is unmanaged.