Site Wiring for System Integrity - Data Warehouse Appliances

2700 Platform Product and Site Preparation Guide

prodname
Data Warehouse Appliances
created_date
March 2018
category
Product Guide
featnum
B035-5341-092K
For maximum system integrity, observe the following:
  • All power receptacles at the site must be wired to support the rated load specified in Input Power Plugs and Receptacles.
  • All system components should be on dedicated branch circuits from a distribution panel that does not supply any switched inductive loads (motors, air conditioners, and so on).
  • Nothing else should be connected to the branch circuits except other computer equipment.
  • The socket-outlet shall be installed near the equipment and shall be accessible.