Add Path Node to the Workflow | Vantage Analyst - Adding the Path Segment - Teradata Analytic Apps - Vantage Analyst

Vantage Analyst Path Analysis Tutorial

Product
Teradata Analytic Apps
Vantage Analyst
Release Number
1.4.1
Published
May 2022
Language
English (United States)
Last Update
2022-05-09
dita:mapPath
val1593625364475.ditamap
dita:ditavalPath
wsp1565965728073.ditaval
dita:id
val1593625364475
lifecycle
previous
Product Category
Teradata Applications
This section provides instructions on adding the segment that you created earlier to the workflow using an nPath node.
To use the a SQL node instead of the nPath node, see Adding the Generated SQL.
  1. Select and drag "" to the canvas.
    vaTutorial_dragNpath
  2. In the properties panel for the nPath node, select the following:
    Connection The Teradata-Vantage database connection that you created earlier
    Database The database that you created earlier
    nPath TUT_BILL_DISPUTE_REVIEW_CONTRACT
  3. Connect the nPath node to the workflow by selecting and dragging the following:
    From To
    The connector dot in the Start node To the nPath node
    The green connector dot in the nPath node To the End node
Your workflow should look similar to this:
vaTutorial_workflowSQLnode_path_complete