Abort Termination - MultiLoad

Teradata MultiLoad Reference

Product
MultiLoad
Release Number
16.10
Published
May 2017
Language
English (United States)
Last Update
2018-07-11
dita:mapPath
cgb1488824663145.ditamap
dita:ditavalPath
Audience_PDF_product_tpt_userguide_include.ditaval
dita:id
B035-2409
lifecycle
previous
Product Category
Teradata Tools and Utilities

The procedure for aborting a Teradata MultiLoad job depends on whether the utility is running on a network-attached or a mainframe-attached client system.

Aborting a Teradata MultiLoad job running on a network-attached client system

  1. Press the Control+C key combination three times on the workstation keyboard.
    Some session(s) of the aborted Teradata MultiLoad job may remain active until the gateway time-out period expires. Error “2574 Operation not allowed: %DBID.%FSTR is being MLoaded.” may occur if the same Teradata MultiLoad job is resubmitted within the time-out period. If this happens, wait until the gateway time out has expired before resubmitting the same Teradata MultiLoad job.

Aborting a Teradata MultiLoad job running on a mainframe-attached client system

  1. Cancel the job from the client system console.