Site Preparation - Data Mart Appliances

680 Platform Product Guide

Product
Data Mart Appliances
Published
February 2018
Language
English (United States)
Last Update
2018-05-09
dita:mapPath
fgu1471886517392.ditamap
dita:ditavalPath
680.ditaval.ditaval
dita:id
B035-6018
Product Category
Hardware
The 680 system ships to the customer site in a transport cabinet. Site preparation for the 680 transport cabinet is identical to site preparation for the 2800 cabinet or the Teradata Platform Framework Cabinet. For site preparation information, see the following:
  • Teradata Data Warehouse Appliance 2800 Platform Product and Site Preparation Guide, B035-6006
  • Teradata Platform Framework Cabinet Model 12 Hardware Installation Guide, B035-5397

The 680 system is placed in a transport cabinet at the factory, then delivered to the site. At the site, the 680 system is tested by Teradata Customer Service Representatives. During testing, the transport cabinet will need onsite power receptacles for powering up the 680 system.

After testing is completed, the chassis in the 680 system are removed from the transport cabinet and installed into a 2800 cabinet or Teradata Platform Framework Cabinet.
The transport cabinet is shipped back to Teradata for reuse.

For information about cabling the 680 system in a 2800 cabinet, see the Teradata Data Warehouse Appliance 2800 Platform Hardware Installation Guide, B035-6007.

For information about cabling the 680 system in a Teradata Platform Framework Cabinet, see the Teradata Platform Framework Cabinet Model 12 Hardware Installation Guide, B035-53977.