Product Information
Product Description
Cabinet Builds for Platform Framework Cabinet
Cabinet Build Conventions
Teradata Chassis Cabinet Builds in a Platform Framework Cabinet
Teradata 680 Cabinet Builds in a Platform Framework Cabinet
Data Domain 890 and ES30 Expansion Shelf Cabinet Builds in a Platform Framework Cabinet
Data Domain 4200 and ES30 Expansion Shelf Cabinet Builds in a Platform Framework Cabinet
Data Domain 7200 and ES30 Expansion Shelf Cabinet Builds in a Platform Framework Cabinet
Oracle SL500 Cabinet Build in a Platform Framework Cabinet
Quantum i80 Cabinet Builds in a Platform Framework Cabinet
Quantum i500 Cabinet Builds in a Platform Framework Cabinet
Cabinet Features Summary
Dell R710 Teradata Managed Server Feature Summaries
BAR Models 455, 457
Base Models 405, 407, 607
Data Mover Models 445, 647
Load Server Models 465, 667
SAS Models 425, 627
SWS Models 45, 47
Teradata Multi-System Manager (TMSM) Models 435, 637
Unity Model 687
Viewpoint Models 415, 617
Dell R720 Teradata Managed Server Feature Summaries
Generic Models 609, 809
BAR Model 655
BAR Model 855
Data Mover Model 849
Ecosystem Manager Model 839
Load Server Model 869
Unity Source Link Server Model 679
Viewpoint Model 819
SWS Model 67
Dell R720xd Teradata Managed Server Feature Summaries
Generic Models 8X0
Load Server High Capacity Model 860
SAS Model 820
Director/Loader and Director/Loader Expansion Server Model 880
Dell R730 Teradata Multipurpose Server Feature Summaries
BAR Admin/Master Model 8-51A
BAR Media Model 8-51D
Data Mover Model 8-41
Ecosystem Manager Model 8-31
Generic Model 8-01
Load Model 8-61
QueryGrid Model 8-71
Viewpoint Model 8-11
SWS Model E31S
Dell R730xd Teradata Multipurpose Server Feature Summaries
Ecosystem Manager, Data Mover Models
Generic Model 8-01X
Generic Model 8-91X
Load Model 8-61X
SAS Model 8-21X
Unity Director/Loader Model 8-81X and Expansion Server Model 8-81XE
Viewpoint, Ecosystem Manager, Data Mover Models
Dell R730xd Teradata Multipurpose Storage Server Feature Summary
In-Cabinet Server Management Network Topology
BAR Interconnect
Disk Storage Interconnect
Product Statements
Regulatory Compliance
Declaration of Conformity 9212
RCM Supplier's Declaration of Conformity 9212
China Declaration Certificate
China Declaration Certificate (continued)
Taiwan Declaration Certificate
Taiwan Declaration Certificate (continued)
Electromagnetic Compatibility Notices
Regulatory Compliance Disclaimer
Product Safety Disclaimer
Cautions and Warnings
Site Preparation Summary
Site Preparation Task List
Hardware Installation Planning
Policy on Moving and Relocating Cabinets
Preinstallation Checklist
Uncrating and Installation
Uncrating the Equipment
Important Information
Tools Needed
Uncrating a Cabinet
Performing Environmental Stabilization
Inspecting the Cabinet for Damage
Disposing of the Shipping Materials
Repacking for Shipment
Positioning and Assembling Staged Cabinets
Positioning a Cabinet
Ganging Cabinets
Installing Stand-Alone Cabinet Stabilizers
Installing the Bottom Front Cabinet Air Baffle
Removing the Shipping Clips for an 18.5-Inch KVM Console
Installing Cabinet Side Panels and Doors
Installing Side Panels
Installing and Aligning Front and Rear Doors
Physical Specifications for Site Planning
Cabinet Descriptions
Dimensions: 42-U Cabinet
42-U Cabinet Footprint and Clearances
Data Center Considerations
Weight and Floor Loading
Site Floor and Ceiling Height Specifications
Floor Layouts
Cables
Cable Management
Network Cables and Hardware
BYNET V4 Fiber Optic Cables
HCA ESCON Cables and Connectors
HCA FICON Cables and Connectors
Available Cable Lengths
Delivery and Installation
Shipping Dimensions and Weights
Moving and Handling Guidelines
Installation Overview
About Environmental Stabilization
Seismic Bracing for a Teradata Cabinet
Site Power Distribution Planning
AC Input Power Distribution
Dual AC Concept
Site Wiring Options for Dual AC
System Load Configurations
Site Wiring for System Integrity
AC Power Cord Egress from Top or Bottom of Cabinet
Input Power Plugs and Receptacles
Platform Framework Cabinet Input Power Plugs and Receptacles
About Grounding
Emergency Power Off (EPO)
Site Environmental Planning
Objectives of Site Environmental Control and Preparation
Environmental Requirements
Power Consumption
Estimated Power for Platform Framework Cabinets
System Thermal Report
Cooling Considerations for Installation Site
About Cooling Capacity Planning
About Cold and Hot Aisles in Floor Layout
Floor Layouts
About Equipment Floor Layout
Hardware Placement Guidelines for Raised Floor and Open Return Environment
Hardware Placement Guidelines for Non-Raised Floor and Containment Environment
Best Practices for Floor Layout
Environmental Elements
How to Measure Environmental Elements
Environmental Measurement Instruments
About Measuring Temperature and Humidity
About Measuring Air Flow
Measuring Air Flow Rate Using an Air Flow Meter and Handmade Air Capture Hood
Evaluating Environmental Elements Before and After an Installation
Evaluating Air Flow
Evaluating Temperature and Humidity
About Environmental Contaminants
Additional Information
Audience
Changes and Additions
Teradata Links
If an air baffle kit (2021-K223) was ordered, at the front of the cabinet, slide the metal part of the baffle under the front lip of the cabinet cross member.
Align the swage nuts in the baffle to the oval holes in the front lip of the cabinet cross member.
Thread the two screws into the pem nuts and tighten.