Installing the Bottom Front Cabinet Air Baffle - BAR Managed Servers

Teradata Platform Framework Cabinet Model 12 Product and Site Preparation Guide

Product
BAR Managed Servers
Published
February 2018
Language
English (United States)
Last Update
2018-04-18
dita:mapPath
lur1471887722020.ditamap
dita:ditavalPath
9212.ditaval.ditaval
dita:id
tlu1471650703436
Product Category
Hardware
  1. If an air baffle kit (2021-K223) was ordered, at the front of the cabinet, slide the metal part of the baffle under the front lip of the cabinet cross member.
  2. Align the swage nuts in the baffle to the oval holes in the front lip of the cabinet cross member.
  3. Thread the two screws into the pem nuts and tighten.