Simultaneous Operation - Parallel Upgrade Tool (PUT)

Parallel Upgrade Tool (PUT) Reference

Product
Parallel Upgrade Tool (PUT)
Release Number
3.09
Published
February 2020
Language
English (United States)
Last Update
2020-02-24
dita:mapPath
ows1493317469465.ditamap
dita:ditavalPath
ows1493317469465.ditaval
dita:id
B035-5716
Product Category
Software
Teradata Tools and Utilities

The Simultaneous Operation step checks for more than one PUT operation running on any master or selected nodes. PUT allows only one operation to run on any master node, and nodes cannot be selected for more than one active operation at a time. When you connect to a PUT-enabled node to run an operation, that node becomes the master node for that operation. Each node selected for an operation receives a lock file containing the pertinent information for the operation that selected the node.

No user interaction is required unless you receive an error or warning message.